Browse Items (18293 total)

BRIDG 9.003.tif
Stone bridge replacing wooden Brunel wooden bridge

BRIDG 9.002.tif
A construction scene of a Brunel wooden bridge being replaced by stone.

TRANS 8.137.tif
PREVREF 1551 & 1552 duplicate photos. German-built by Arthur Koppel of Berlin which handled all roadstone products for export between 1904 and 1941

PREVREF 1546 & 1547 duplicate photos

TRANS 8.136.tif
It was said that the driver turned his hat round when train in reverse. PREVREF 1549 duplicate copy

SHIP 8.072.tif
W. LONGSTAFF & Co's 2,900 ton ship loading loadstone at Newlyn from the Amey Roadstone Corporation's conveyor belt network installed my MM T D Cranes Ltd in 1972. Conveyor equipment was manufactured by Messrs Naylor Bros, of Warrington. It was…

SHIP 8.071.tif
The Solentbrook's hold being filled with Penlee roadstone.

SHIP 8.070.tif
The Solentbrook, W Longstaff & Co's 2,900 ton d.w. ship loading stone at newly from the then newly-installed conveyor which replaced the railway system.

SHIP 8.069.tif
Marianne awaiting a roadstone cargo at the end of Penlee's conveyor at Newlyn pier.
Output Formats

atom, dcmes-xml, json, omeka-xml, rss2