DD.028.tif
General view of excavation works. One man can be seen in the centre of the image above the track by a ladder. Image is annotated "Works on left bank of river looking upstream 3-9-59" Stamped on reverse "Richards Bros Penzance"

DD.029.tif
View of the layers of excavation. Image is annotated "Excavation & concrete left bank of river 3-9-59"
Stamped on reverse "Richards Bros Penzance"

DD.030.tif
General view of workings. Annotated "General view from left bank 30-9-59"

DD.031.tif
General view of excavation works. Several men working on the site, including a man walking along the shuttering (centre) and also men along scaffolding on right. Annotated "Concrete works right bank of river looking upstream 3-9-59" Stamped on…

DD.032.tif
View looking down site, finished concrete on left. Men scrambling over scaffolding and pipework on the left centre.
Annotated "General view from right bank 30-9-59"

DD.033.tif
Annotated "Excavation for spillway foundation"
Puddles to the foreground, two men standing centre right. Scaffolding draped with material/overalls.

DD.010.tif
Man at top of image working on a trench, broom in middle gives idea of scale
Image is annotated "Excavation of trench for 18" diameter supply pipe 7-5-59"
Stamped on reverse "Richards Bros Penzance"

DD.018.tif
View of excavation work. Man in shirt and tie front left, several men working towards the rear. Shuttering and flues visible.
Annotated "Tunnel Monolith, looking upstream 6-7-59".
Stamped on reverse "Richards Bros, Penzance".

DD.019.tif
Concrete Pour into Tunnel monolith, two men working in the shuttered area at end of hose, others are above. Image taken same day as DD.018.
and annotated "Placing concrete in tunnel monolith 6-7-59."
Stamped on reverse "Richards Bros Penzance"

DD.007.tif
Image is annotated "General view of excavation, plant, etc. on right bank of river 7-5-1959"
Number of lorries and machinery show scale.
Stamped on reverse "Richards Bros Penzance"

M.1281.tif
Drift Dam.

CON 8.005.tif
Work started by Sir Robert Mc Alpine & Sons on 1 Mar 59 completed 1 Apr 61

M.2056.tif
Drying nets after 'barking' (soaking in preservative) Newlyn Harbour. The vessel in the distance is waiting to to come into the Harbour to load Penlee quarry stone at the South Pier.
One of Stevenson's 75' wooden trawlers can be seen on the…

IND 9.007.tif
Drive shaft abandoned in the undergrowth.

TRANS 30HG 029.tif
Couple had probably driven from John O' Groats note AA Road Service Motorbike