  • Collection: Drift Dam

DD.127.tif
Man with bobble hat in pit using an electric drill, another man with leather apron looking on from above.
Date stamped on bottom right and stamped "Richards Brothers, Penzance" on reverse

DD.126.tif
Shuttering and props in pit below sheds.
Date stamped bottom right and stamped "Richards Brothers, Penzance" on reverse.

DD.125.tif
General view of site.
Date stamped on bottom right

DD.124.tif
Two rectangular holes filled with water from above. Brick pentagon-shaped hole at base. Date stamped at bottom.

DD.123.tif
General view.
Date stamped bottom centre

DD.122.tif
View looking over sheds and pipework. A few men working centre right. Date stamped bottom left.

DD.121.tif
Overview of site showing pitometer, round storage tower and work buildings. Date stamped bottom right.

DD.120.tif
Work on site, several men in photograph, a vehicle in background displaying "Venn Bros" on side. Dated stamped at bottom right.

DD.119.tif
Image shows the pitometer which governs the flow of water up and downstream. It is annotated "Filter shell and pitometer w.w.meter 2nd Oct 1964"

DD.118.tif
Close-up of the top of tower showing the structure and shuttering. The image is annotated "Tower, dome roof ribs prior to soffit shuttering being fixed 20-5-63"

DD.117.tif
View upwards towards the top of the tower showing construction of scaffolding. The image is annotated "Tower from the S.E. 23-5-63"
The reverse is stamped "Richards Brothers, Penzance"

DD.116.tif
Construction of Tower showing progress, two men standing on scaffolding above it. The image is annotated "Tower 60ft high from access road. 7-3-63"
The reverse is stamped "Richards Brothers, Penzance"

DD.114.tif
Men working on concrete pour on the tower. Cottages in the village can be seen in the background. The image is annotated "Tower, 9th lift being vibrated. 27-11-62"

DD.115.tif
Man working on the concrete pour on Drift tower. The image is annotated "Tower, 9th lift being vibrated. 27-11-62"

DD.113.tif
Men working with concrete up on the tower. The image is annotated "Tower, 9th lift being vibrated 27-11-62"

DD.112.tif
Men unloading concrete from lorry for construction of tower. The image is annotated "Tower, ready mix lorry unloading 27-11-62"

DD.111.tif
Close-up of tower surrounded by scaffolding, buttresses can be seen supporting the circular construction. The image is annotated "Tower 30ft high from S.E. 27-11-62"

DD.110.tif
Construction of tower at the dam site, a lorry delivering concrete alongside to the right. Three men high up on the scaffolding. The image is annotated "Tower from access road 9th lift being placed 27-11-62"

DD.109.tif
Overview of the dam and valley, and reservoir almost full. The image is annotated "Drift Reservoir nearing completion 1-2-61"
It is stamped on the reverse "Richards Brothers, Penzance"

DD.108.tif
View of central section of dam, water and small inflatable boat to the right. A few men working at the top middle section. The image is annotated "View of upstream face showing widened section 4-1-61"
It is stamped on the reverse "Richards Bros,…