Skip to main content
Search using this query type:
Keyword
Boolean
Exact match
Search only these record types:
Item
Collection
Advanced Search (Items only)
Morrab Library
Advanced Search
Browse Items
Browse Collections
Map
About
Contact Us
Browse Exhibits
Browse Items (127 total)
Browse All
Browse by Tag
Search Items
Collection: Drift Dam
Previous Page
Page
of 7
Sort by:
Title
Creator
Date Added
Tower Construction
Men working with concrete up on the tower. The image is annotated "Tower, 9th lift being vibrated 27-11-62"
Tower Construction
Construction of Tower showing progress, two men standing on scaffolding above it. The image is annotated "Tower 60ft high from access road. 7-3-63"
The reverse is stamped "Richards Brothers, Penzance"
Two holes in ground
Two rectangular holes filled with water from above. Brick pentagon-shaped hole at base. Date stamped at bottom.
View of site
General view.
Date stamped bottom centre
View of site
General view of site.
Date stamped on bottom right
View of worksite
Overview of site showing pitometer, round storage tower and work buildings. Date stamped bottom right.
Worksite from above
View looking over sheds and pipework. A few men working centre right. Date stamped bottom left.
Previous Page
Page
of 7
Output Formats
atom
,
dcmes-xml
,
json
,
omeka-xml
,
rss2