Browse Items (93 total)

  • Collection: Drift Dam

DD.027.tif
Close-up image of the valve tower construction. The circular valve can be seen centre right. Two men standing on scaffolding poles and more seen above. It is annotated "Valve tower foundation. Concrete etc 3-9-59" Stamped on reverse "Richards Bros…

DD.030.tif
General view of workings. Annotated "General view from left bank 30-9-59"

DD.032.tif
View looking down site, finished concrete on left. Men scrambling over scaffolding and pipework on the left centre.
Annotated "General view from right bank 30-9-59"

DD.033.tif
Annotated "Excavation for spillway foundation"
Puddles to the foreground, two men standing centre right. Scaffolding draped with material/overalls.

DD.034.tif
View of shuttering for concreting. Men at work by long ladder in centre and above cylinder top right.
Image is annotated "Construction work left bank 30-9-59"

DD.035.tif
View of men positioning wooden joists for shuttering, preparation for concreting. 3 men watching from above. Image is annotated "Typical shuttering 30-9-59"

DD.036.tif
Close view of machinery and crane bucket, man sitting on a rock on extreme left, shuttering in background. Image is annotated "Foundation of spillway looking upstream 30-9-59"

DD.037.tif
General view of the construction, note men standing on scaffolding middle left. Image is annotated "Construction works on right bank of river 4-11-59"

DD.038.tif
General view with construction and boulders on left, a crane to the right. Image is annotated "View from Tail Bay 4-11-59"

DD.039.tif
Preparing the car park, dam construction in background. Image is annotated "Car park under construction 4-11-59"

DD.040.tif
General view of dam construction. Image is annotated "Construction works on left bank of river 4-11-59"

DD.041.tif
General view of shuttering work, McAlpine crane right foreground. Image is annotated "Shuttering of left bank monolith 4-12-59"

DD.043.tif
View across the valley showing construction. A McAlpine crane can be seen middle right.
Annotated "General view from right bank 4-12-59"

DD.045.tif
General view of construction across the valley. Image shows a crane middle left and three men working on scaffolding in the centre. Note no safety equipment.
Image is annotated "View from left bank of river 4-12-59"

DD.046.tif
Close view of construction , taken on same day as DD.045. Men can be seen standing at the base of the monolith and one at the bottom of the image.
It is annotated "Profile of monolith on right bank"

DD.047.tif
Image showing men working as concrete is being poured. The image is annotated "Concrete being placed. Overflow weir section 1-1-60"
Stamped on reverse "Richards Bros, Penzance"

DD.048.tif
Image shows men working at the base of the monolith during a concrete pour. Two men working on bare scaffolding above with no harnesses or safety equipment.
Annotated "Construction work on lemftbank 1-1-60"
Stamped on reverse "Richards Bros,…

DD.049.tif
Image is annotated "Construction in overflow weir section 1-1-1960"
Couple of men centre bottom

DD.050.tif
General View of Construction. One man can be seen standing on top of dam on left side. There are also men working on the other monolith on the scaffolding and at the base on a concrete pour.
Image is annotated "View of dam from right bank 1-1-60"

DD.051.tif
General view looking down on shuttering for the spillway.. Some men working towards bottom centre. Image is annotated "Spillway foundation from left bank downstream 1-2-60"