Mr R.G. Bell at the 110v motor generator change-over panel. Pictured behind him is 110v mgs, with 10v mgs nearest the camera. On his left is a 110v distribution board. On his right are the main supply switches and battery switchgear. On the extreme…
Survey operations in the Mediterranean for Mat 1 telephone cable project. The ship was on charter to Italcable for the work.
The picture shows TV screen showing the sled full of weed on ocean bed.
During April 1965, C.S. Stanley Angwin (2,500-ton gross) surveyed the route for the Tortola-Bermuda telephone cable which will provide the northern outlet for the 21-million W.I. dollar project in the Eastern Caribbean to improve inter-island and…
This photograph shows survey operations on board the C.S. Recorder in the Mediterranean for the Mat I telephone cable project. The ship was on charter to Italcable for the work. On the foredeck, you can see the survey sled.
General view of one of the many engineering training departments showing telegraph relay equipment for student training at the Cable & Wireless Engineering College in Porthcurno.
C Ds from Robin Lenman of Serena Wadham Archive Catalogue/Chronological lists/photos stored in the Archives Room. Morrab Library CopyNO NEGATIVE OR PHOTOGRAPH PRESENT
The Hong Kong/Guam section of SEACOM was laid during September and October of 1965. Assisted by Cable & Wireless Ltd, repair ship Cable Enterprise Mercury completed the lay into Guam on 22 October 1965. This photograph shows a repeater entering the…